Skip to main content

Request a quote

Send the Requirement, Get the Bill of Materials

One quotation covering cameras, PoE switching, cable, recording and the control room, with the wattage and storage maths shown rather than assumed.

  • Layout and bill of materials at no charge
  • PoE budget and storage arithmetic shown
  • Reply within one business day

What happens after you send it

  1. 1

    You send the requirement

    Building type, floors, camera positions or a floor plan, retention period, destination port and deadline.

  2. 2

    We check it and ask the gaps

    Usually two or three questions — cable runs, whether there is a control room, and what the client has been promised.

  3. 3

    You get a bill of materials

    Cameras by position and form, PoE switches with the wattage checked, recorder channels and drive capacity, cable quantities and unit prices.

  4. 4

    You get the lead time in writing

    Along with the terms, the packing and what happens if a line item needs substituting.

Four things that speed it up

  • A floor plan, even a phone photo of a printed one, saves several rounds of questions.
  • Tell us the retention period in days rather than “as long as possible” — it decides the drive size.
  • If you have a competing quote, send the bill of materials rather than the total. It is the line items that decide the comparison.
  • Say whether this is phase one. It changes whether we size the switch and recorder for the final camera count.

Prefer to skip the form? Message us on WhatsApp (Tom, +8613922702227) or email sales@cctvsecuritycamerafactory.com 。

Request a quote

We use your details only to answer this inquiry. No newsletters, no third-party sharing.